Shandong Tengfei Hoisting Engineering Co., Ltd.

Shandong Tengfei Hoisting Engineering Co., Ltd.

Manufacturer from China
Verified Supplier
1 Years
Home / Products / 350T Crawler Crane /

Used 350T Crawler Crane Xcmg Safely And Easily Lifting Capacity 1.5 km/h

Contact Now
Shandong Tengfei Hoisting Engineering Co., Ltd.
Visit Website
City:zibo
Province/State:shandong
Country/Region:china
Contact Person:MrGong
Contact Now

Used 350T Crawler Crane Xcmg Safely And Easily Lifting Capacity 1.5 km/h

Ask Latest Price
Video Channel
Brand Name :XCMG
Model Number :XGC350
Place of Origin :China
MOQ :One Crane
Price :Negotiable Price
Payment Terms :L/C,T/T
Supply Ability :Supply According to Customer Needs
Delivery Time :According to Order Confirmatio
Packaging Details :Packing According to Customer Requirements
Max Line Speed :120 m/min
Boom Length :18-84 meters
Engine Power :298 kW
Max Lifting Capacity :350 tons
Counterweight :90 tons
Gradeability :30%
Fuel Tank Capacity :800 liters
Max Line Pull :350 kN
Track Shoe Width :1.5 meters
Travel Speed :1.5 km/h
Slewing Speed :1.5 rpm
Max Lifting Height :120 meters
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

XGC350t Crawler Crane Technical Specifications


Crawler crane models: XGC350
Max rated lifting capacity: 350t
Max lifting moment: 2400t.m

Product Overview

1.Boom combination

The main boom length is 24m~96m (standard 66m), and the boom sections are composed of: bottom boom 1×10.5m, transition boom 1×12m, connecting section 1×1.5m, intermediate section 2×6m (standard 1 piece), intermediate section 3×12mA, intermediate section 2×12mB (optional), and 1 standard 300t boom head pulley block (standard). The main boom can be equipped with a single pulley at the arm end.

The tower boom length is 24m~66m (standard 42m), and the boom sections are composed of: bottom boom 1×9m, intermediate section 1×6mA, top boom 1×9m, intermediate section 1×6mB, intermediate section 3×12m (standard 1 piece), front bracket 1×9.5m, and rear bracket 1×9.5m. The tower boom can be equipped with a single tower boom pulley.

The length of the light main boom is 73.5m~115.5m (optional standard 97.5m), which is composed of the main boom section and the tower boom section. The light main boom can be equipped with a tower boom single pulley.

The length of the fixed jib is 9m~12m (optional standard 9m), and the boom section consists of: bottom section boom 1×4.5m, top section boom 1×4.5m, middle section 1×3m (optional), and fixed jib bracket 1×7m.

2.Boom luffing member

It adopts high-strength pull plate structure with high safety factor; the pull plate transition adopts balanced beam structure with uniform force; the "peach" shaped connecting hole makes installation easy, labor-saving and efficient.

3.Mast

The mast is composed of a box-shaped double-limb structure with a reinforced crossbeam between the two limbs, which provides good stability. The mast lifting cylinder can rotate around the connection hinge of the turntable to realize the lifting and lowering of the mast. The mast has a super-lift interface reserved.

4.Turntable

The turntable is a key bearing structure for connecting the upper and lower vehicles. It adopts a double-sided "I" beam box frame composite structure welded from high-strength steel plates. It can be connected to the lower vehicle through a slewing bearing, with high overall strength and good stability. The control room, main luffing mechanism, engine system, hydraulic main pump, hydraulic valve, electric control cabinet, mast, main boom bottom section, upper vehicle counterweight and other components can be connected to the turntable at different locations. The turntable has reserved an ultra-lifting interface.

5.Mechanical components

The machine's structure configuration and purpose are as follows

No.

Name

Usage

Layout location

1

Main lifting mechanism I

HB/1,HBS/1,LB/1,LBS/1,HW/1,HWS/1,HBW/1,HF/1,HBF/1,TBF/1 as main hook winch

The lower part of the main boom is close to the middle

2

Main lifting mechanism II

HWS/3,HBW/3 as a third hook winch

Bottom of main boom, close to the root [optional]

3

Auxiliary lifting mechanism

【1】HBS/2,LBS/2,HFS/2,HBF/2, TBF/2 as secondary hook winch

【2】Tower boom luffing winch for tower type working conditions

The lower part of the main boom bottom section is close to the front

4

Main luffing mechanism

Main boom luffing winch

Center and rear of the turntable

5

Slewing mechanism

Crane slewing

Front left side of turntable

6

Traveling mechanism

Machine traveling

Crawler drive wheel

The main lifting mechanism and the auxiliary lifting mechanism can realize the joint lifting of the main and auxiliary hooks under shield working conditions.

6.Lifting mechanism

The lifting mechanism includes main lifting mechanism I, auxiliary lifting mechanism and main lifting mechanism II (optional). The lifting mechanism is driven by a motor with a planetary gear reducer, and the main hook or auxiliary hook is lifted and lowered through a drum and luffing pulley set.

The lifting mechanism includes main lifting mechanism I, auxiliary lifting mechanism and main lifting mechanism II (optional). The lifting mechanism is driven by a motor with a planetary gear reducer, and the main hook or auxiliary hook is lifted and lowered through a drum and luffing pulley set.

7.Luffing mechanism

The luffing mechanism includes the main luffing mechanism and the tower boom luffing mechanism.

The main luffing mechanism is driven by a motor with a planetary gear reducer, and the main boom luffing is achieved through a drum and a luffing pulley set.

The main luffing mechanism has a built-in planetary reducer and adopts a normally closed brake to achieve the "spring brake/hydraulic release" function, which is safe and reliable.

The main luffing drum is equipped with a ratchet locking device, and the pawl is driven by a hydraulic cylinder to achieve multiple locking protection. The main luffing mechanism uses a left-handed, alternating, non-rotation-resistant special steel wire rope with a rope diameter of 26mm and a length of 370m.

The tower boom luffing mechanism and the auxiliary lifting mechanism are the same device, and the tower boom luffing is achieved through function switching.

8.Slewing mechanism

The slewing mechanism and the slewing bearing are driven by external meshing and arranged in front of the turntable. The motor drives the planetary gear reducer to drive the slewing bearing, which can achieve 360° rotation.

The slewing mechanism has a built-in planetary reducer and a normally closed brake to achieve the "spring brake/hydraulic release" function, ensuring that the slewing has extremely high braking safety.

The slewing mechanism is also equipped with a mechanical slewing locking device to achieve locking protection of the slewing mechanism. The slewing mechanism has a free sliding function.

9.Slewing bearing

The large-diameter raceway-reinforced three-row large roller slewing bearing has large bearing capacity, small resistance, wear resistance and long service life.

Inquiry Cart 0